% notes for the august7 meeting. Purpose: Status of Deployment. Attendees: Jielun Sun, Britt Stephens, Steve Oncley, Alex Guenther, Sean Burns, Tony Delany, Tim, Brian Lamb, Peggy LeMone, Don Lenschow, and Teresa Campos. Some Items: ------------ * Alex will fly one balloon from Aug 12-17. The tentative plan will be to fly 3 balloons from Aug 19-24 (but this can be changed). Using the PDA 4 channels of data can be recorded. Andrew will check into getting LiCor data from C-1. * Brian Lamb will run till Friday, Aug 16th. SF6 data are collected continuously. * Hydra is almost ready for deployment. Ion optics systems have arrived. * The design of tram is starting to take a more real form. The plan is to sample at 1m and 3m hts with the tram moving at 5 m/s. The line will be about 200m. It will run in a circular path. * Cal gasses have been ordered for the cross-calibration. Britt will focus more on the cross-calibrations then the Russian CO_2 sensor. * The ATD towers are up. Instrumentation will be up next week. * Andrew will borrow the differential GPS from LTER for accurate measurements of the locations of the ATD towers.