STEPS OPERATIONS JOURNAL

    Date: May 5, 2000
    Operations Director: Name


DEBRIEFING OF FIELD PREPARATIONS ON 0505:

May 02:
CHILL antenna and radome were installed without any problems.
May 04:
SPol has been transported to its site near Idalia Colorado and is being setup.
May 05:
Three dial-up phone lines (719 346-6037, 346-6038, and 346-6039) have been connected in the Ops Center. An answering machine should be installed sometime next week.


EQUIPMENT STATUS:

SYSTEM STATUS
Ops Center Installation continuing
CHILL Antenna and radome installed
S-Pol Installation underway
LMA Installation underway
MGLASS Not yet operational
T-28 Not yet operational
Storm ballooning Not yet operational
Mobile Mesonet Not yet operational
YRFS Operational
NWS Operational