STEPS OPERATIONS JOURNAL

    Date: July 16 2000
    Operations Directors: None


WEATHER FORECAST:

    Forecasters: None

Today:

Cold frontal passage is expected sometime during the day, possibly late.

Note: The 9am formal weather briefing and debriefing of the previous day's operations have been suspended. We will maintain a daily look at the weather, but no other briefings/debriefings will be conducted. The forecast matrix will no longer be posted.


EQUIPMENT STATUS:

The following research systems are all operational: S-Pol, LMA, and YRFS. These systems are all that remain available to STEPS. S-Pol will continue through Sunday, July 16, mostly for Charlie Knight's young cloud studies, but will be available to scan storms in the LMA 2D/3D lightning mapping area should they develop +CGs.


EXPECTED OPERATIONS FOR 0716:

Since no storms of interest to Paul Krehbiel or Charlie Knight were expected, S-Pol was not operated.


DEBRIEFING OF OPERATIONS FOR 0716:

Widespread rain did occur in the STEPS domain, but with little embedded strong convection. No S-Pol storm scans were taken.