Working Schedule for Slant-path delay in IUM

(Draft prepared by Yong-Run Guo, 12 January 2011)

Tasks

1, Implement the simple observation operator of (straight-line) slant-path total delay (STD) in WRFVar to assimilate the data from BMB ground-based GPS network

2, Get the results comparable to and better than those from ZTD assimilation for the selected cases in Beijing area

3, Start to upgrade the forward observation operator by using ray-tracing approach

Basic working schedule for year of 2011

 

 

 

By 15 February 2011

obsproc

FM-115 for STD, place the zenith angle in “height field”

By 15 March 2011

WRFVar

Improve “da_get_innov_vector_gpssdelay.inc”

Modify the related codes in da_obs_io and da_obs directories                                            

Calculate (O-B) for one case with the real STD obs

By 15 April 2011

(O-B) statistics

Compute the statistics for different zenith angle and azimuth angle.

By 31 May 2011

Tangent linear and adjoint

Develop the tangent-linear and adjoint code of the observation operator

1 June to 31 August 2011

Zhong visit NCAR

Report the statistics of BMB network STD data

Continue develop the codes for STD assimilation in WRFVar

Obtain the preliminary STD assimilation results.

1 September to 31 October 2011

Tuning STD obs errors

Tuning the STD obs errors

Consider the STD obs error correlation

Early November 2011

Guo visit IUM a week

Review the STD work with WRFVar

31 December 2011

Report

Write a report for STD assimilation with WRFVar.