The 14th BMB-NCAR Project Meeting

Time: 02:00~03:30 pm, Dec 19, 2005

Participants: Dir. Kuo, Dr. Huang, Dr. Guo, Shui-Yong Fan, Jiqin Zhong

1.   Discuss the project progress

Wxperiments

Shui-Yong had run case 0607 one more time and showed the precipitation forecasts and verification scores of EXP02, EXP08, and EXP11 respectively.  It was found that using T213 forecast as background led to more serious false alarm in 0607 case. The score of this single case showed forecast improvement by using AVN 12h forecast as background.

Shui-Yong also calculated new WRF BES using gen_be with WRF forecast of 15 days. The BE structures were similar with those of MM5. Shui-Yong will continue the BE work at IUM.

The landuse in WRF looks reasonable. The grid-point precipitation problem was also found in MM5.

Visits to IUM

Dr. Huang visited IUM last week. He gave two presentations on DFI and 4DAVR, respectively, in addition to the project review. He also made further planning for the BMB-UCAR project with the IUM management.

At MMM, Jiqin will focus on running 27km domain, and the multi-domain will be run in NCAR only in case of abnormal situation occurred with running in IUM. Jiqin should compare verification scores of WRF model and MM5 model of the cases during Jun 1-7. Once WRF model is proved to have better performance, all following research will be carried on based on WRF model. Jiqin should spend most of her time at NCAR on the BMB local data. Currently only TEMP and SYNOP are used in the BMB operational data assimilation system. It was agreed that other conventional data, e.g. PILOT and AIRCRAFT, should be included. This means a request to BMB to get the data from CMA and impact studies. After the BMB local data, Jiqin may run a few experiments with conventional observations other than TEMP and SYNOP to assess their impact.

At IUM, Shui-Yong will continue his work and extend the 27 km domain work to nested domains, and extend the experiment length from 1 week to 1 month. It is planned to have a major operational upgrade, which should include WRF-Var, new BE and AVN.

He also discussed with IUM management and Min Chen the possibility of a DFI work and made a preliminary plan.

 

Dir. Guo also shared with the group some information he got during his trip to Beijing 2 weeks ago. Most B08 RDP participants planned to test their systems in Beijing in August next year. This requires WRF model could be run operationally before August 2006. High resolution model analysis fields and observations are required by these participants. We need do more on cases in August.

2 Make a task list

3 Next meeting

The next meeting will be at 2:00 pm, Jan 3, 2006.