The 19th BMB-NCAR Project Meeting
Time: 02:00~03:00 pm, Feb 28, 2006
Participants:
Dr. Huang, Dr. Guo, and Jiqin Zhong
1.
Discuss
the project progress
Jiqin had got the WRF-Var based verification package
worked with WRF forecast. There are still problems with the computation of the
RMS and BIAS of pressure of SYNOP data.
Jiqin found there was problem within assimilation of
pressure in SYNOP data when sfc_assi=2. Dr. Guo agrees to manage to resolve
this problem by modifying the 3DVAR OBSPROC package.
New experiments list:
|
EXP11 |
avn12f, MM5 model, WRFVAR passed=4, var_scaling=1, len_scaling=1,
check_rh=2, sfc_assi=1 t_err=2C, p_err=100pa, v_err=1.1m/s rh_err=10% |
|
EXP15 |
The same as EXP11, but with sfc_assi=2 |
|
EXP16 |
The same as EXP15, but with t_err=1.3C, p_err=100pa,
v_err=0.9m/s rh_err=6% |
|
EXP17 |
The same as EXP11, but with WRF model |
|
EXP18 |
The same as EXP17, but use WRF 12h forecast as
background |
2.
Make
a task list
Get the WRF-VAR based verification package to be used to verify MM5 forecast. Compare the verification scores of EXP11 with that of the EXP11_wrf_avn12f
Run EXP11_wrf_wrf12f and compare the verification scores with that of EXP11_wrf_avn12f
Rerun EXP16 after the bug in running with sfc_assi=2 is resolved.
3. Next meeting
The next meeting will be at 2:00 pm, Mar 14, 2006.