The Fifth Meeting Memo of BMB-NCAR Project
Time: 02:00~03:30 pm, Aug 18, 2005
Participants: Dr. Huang, Dr. Guo, Shui-Yong Fan
Main contents:
1、 Discuss
the project progress since last meeting:① Shui-Yong collected the
verification results of MM5 operational system during June 2~7 from Ji-Qin. ② Shui-Yong made a detailed note
on all of the 710 data. ③ Dr. Guo found some mistakes
in the Little_r observation file for 3DVAR_OBSPROC, and Shui-Yong has fixed the
decoder program. ④ Shui-Yong did many single-obs
tests and showed the results to Dr. Huang and Guo. After the discussion, all of
three think the BES of MM5 operational system has some unreasonable structure
and should be replaced by a better BES, for example, BES of KMA. ⑤ Shui-Yong wrote some code of
gen_be stage0 for MM5, but all code is still uncompleted. ⑥ Dr. Guo discussed the
Balance_type=3 in MM5 operational system with Syed Rizvi. If with a "balance_type=3" BES, the
response between wind and temperature are normal at
middle and high levels but anomalous at the low levels? Rizvi thought that for
Indian region the main difference (between BE with balance type 1 and 3)
noticed was in the lower levels (850 hPa and below) and in areas with high
topography. The contribution of balanced component of pressure was large with
balance_type =3, and there was no anomaly noticed with single obs test, in the
sense that 1 K temperature warming at lower levels (close to surface) produced
cyclonic circulation in the lower levels.
2、 Make a task list for Shui-Yong:① Plot the verifications of BMB operational forecast from Jun1-7,2005. ② Replace mm53dvar by ncar3dvar and BMB BES by KMA BES, make and verify the MM5 forecast from June1-7,2005, and then plot the verifications to compare with the verifications of BMB operational forecast. ③ Continue to complete the work of gen_be stage0 for MM5.
3、 Because
Dr. Guo will be away for 3 weeks, so next meeting will be at 2:00 pm, on Sep 7.
Shui-Yong and Dr. Huang will discuss project progress regularly before the next
meeting.