The Sixth Meeting Memo of BMB-NCAR Project
Time: 02:00~03:30 pm, Aug 29, 2005
Participants: Dr. Huang, Dr. Guo, Shui-Yong Fan
Main contents:
1、
Discuss the
verification results of EXP01:Shui-Yong
showed the verification results of EXP01. (EXP01: a one-week-testing experiment
with ncar3dvar and KMA BES and MM5 model. Testing week
is from Jun 1 to 7, 2005. Only MM5 model used the IUM operational
configuration.) The scores are compared with the OPR scores came from Beijing (IUM
operational system is called OPR). Some surface fields, e.g., t2m and rh2m, scores
for EXP01 are worse than those of OPR. Both Dr. Huang and Guo thought more
experiments should be done, including running OPR on NCARÕs bluesky to get a
standard reference (EXP00) and tuning some parameters and changing KMA winter
BES to KMA summer BES (EXP02、03É). Shui-yong should make an experiment
list to record every experiment. Dr. Guo also pointed out the observations for
verification should be quality controlled, especially checked against
background.
2、
Make a task list for
Shui-Yong:① Run EXP00 to make sure that the MM5 operational
system on NCARÕs Bluesky is the same as that on BMBÕs Dawning. ② Replace KMA winter BES by
KMA summer BES, tune some namelist options and run more experiments. ③ Make a detailed record to every experiment procedure
and result. ④ Learn the verification code, tune the QC related
parameters and re-calculate EXP01 scores. ⑤ Continue to complete the stage0 work.
3、
Next meeting will be
at 2:00 pm, on Sep 13.