Summary for 15 October – 27 October 2006
Reporting time (for this report): 30 October 2006
Shuiyong re-calculated the BE for 27 and 9km domains using the accumulated forecast samples in a period of half a month with the setup of WRFSI+WRF and AVN 12-hourŐs forecast interpolated as initial condition. But the similar problem as previous experiments still exists in the results.
This task is
finished. Please refer to MinŐs summary.
Jiqin spent some
time to finish the performance comparison between operational MM5 and
pre-operational WRF runs during the summer of 2006. But the results will be
reported next time.
The codes relating with vertical level verification has been prepared. But further tests will be performed.
According to the
discussion of our previous tele-meeting, the OSE experiments should be
performed with the GTS data which is collected from the IUM/BMB local network. The
available GTS historical data of this summer was just received from the
National Meteorological Information Center today. Although Jiqin had spent a
lot of time on processing the data from 9210 distributing system, as the format
of the data from NMIC is different with the one from 9210, she still have to
spend some time on data processing next week before OSE experiments.
Min and Shuiyong are working on the setup of an operational cycling framework using WPS+WRFVAR+WRF. But the ndown.exe is found to be problematic when generating the nested initial conditions from WPS results.
Shuiyong finished
coding for the interface of our local profiler data in WRFVAR and some
experiments were performed.
No report is required from Zuofang.
The work was planned to start next year. No report is required.
Next
report time: 10 November, 2006!!