The 31th BMB-NCAR Project
Meeting
Time: 7:30
pm~8:30 pm, 15 February, 2007
NCAR/MMM Participants: Dir Kuo, Dr Huang, Yong-Run Guo and Dr Wang
IUM Participants: Dir Wang, Min Chen and Shui-yong Fan
1. Dr Wang has received the data and scripts
for both WRF and MM5 tests performed in BMB. NCAR staff has run one case and
further conclusions will be available a few days later. Dr Wang will provide a
list of plotting namelist files with which BMB staff will plot the model
outputs to identify whether they the same as NCAR staffŐs results. A detailed
README file will also be provided by BMB staff to explain the structure of the
directories of the scripts and data cd.
2. A plan about WRF model tuning has been
submitted by Dr Wang. BMB hopes Dr Wang can spend more time during the very
first 3 month of the third year (March to June, 2007) on this project as BMBŐs
system should be ready in the end of June. Zuofang Zheng will be responsible for WRFŐs local tuning under the guidance
of Dr Wang.
3. During Shui-yongŐs future 3-month stay in
NCAR, he will focus on the tuning of WRF-based 3km/3hr cycling system. He will
also spend some time to help Dr Wang to set up the BMB cycling system on NCARŐs
computing platform if necessary. A set of 3-km cycling WRF results should be
ready before Shui-yongŐs departure for the purpose of BE calculation and
comparison.
4. A draft of the detailed working plan for the
third year has been provided by Min. Director Wang suggested that the intensive
sounding data at 06 and 18 UTC should be added as a data type of OSE
experiments. Min will prepare an updated version of the working plan with all
comments and suggestions.