Project meeting
11/04/2008, 14PM, FL2-2072
Participants: NCAR/MMM - Hans, Yongsheng, Xin, Hongli, Ruifang
Work done:
- Airdat opened an account for us to test the code on its IBM machine; The WRF-Var compiled successfully there.
- Observation operator and quality control precedure are done.
- Disk IO is updated to memory IO in WRF-Plus; The re-constructure of wrf adjoint model doesn't finish yet.
Work on going:
- Summarize the test experiment results to show how the TAMDAR data works in WRF-Var.
- Test the performance optimization of WRF-4Dvar system since the disk IO has moved to memory IO.
- Prepare for a real case study; Ask Peter for help in case choise, model setup et.al.
- 3-Dvar cycling data assimilation and forecast experiment should be carried out firstly, and then start 4D-var experiment.