BMB-UCAR Project
Training,
Research and Operational Implementation of WRF 3D-Var
March
2005 - March 2008
Tasks:
Task 1: System design and initial tests.
Task 2: Training of BMB staff WRF 3DVAR at NCAR.
Task 3: Implementation of the WRF3DVAR system on BMB's computing
environment.
Task 4: Testing and improving the computational performance of WRF3DVAR
system.
Task 5: Evaluating and enchancing the meteorological performance of the
WRF3DVAR system.
Task 6: Monitoring of pre-operational runs and case studies.
Task 7: Monitoring of operational use of WRF3DVAR at BMB, and
additional case studies.
| Schedule | (Start:
18 March 2005) |
done | ongoing |
planned |
| M |
A |
M |
J |
J |
A |
S |
O |
N |
D |
J |
F |
M |
A |
M |
J |
J |
A |
S |
O |
N |
D |
J |
F |
M |
A |
M |
J |
J |
A |
S |
O |
N |
D |
J |
F |
M |
|
| Task 1 |
|||||||||||||||||||||||||||||||||||||
| Task 2 |
|||||||||||||||||||||||||||||||||||||
| Task 3 |
|||||||||||||||||||||||||||||||||||||
| Task 4 |
|||||||||||||||||||||||||||||||||||||
| Task 5 |
|||||||||||||||||||||||||||||||||||||
| Task 6 |
|||||||||||||||||||||||||||||||||||||
| Task 7 |
Contact: guo@ucar.edu
Last
Modified: 17 November 2005